How to price a job and still make money

Most underpriced quotes are not wrong about the big items. They are wrong about the hourly rate and the small things nobody wrote down.

By Chris M, Director, AI MetricUpdated 21 November 20264 minute read

In short

  • Work out an hourly rate that covers your overheads and the wage you want, divided by the hours you can actually bill.
  • Price materials at today's merchant price, with waste, then add your markup.
  • Add the costs that hide: access, disposal, travel and parking, sundries, making good, hire.
  • Add profit on top, separately from your wage.

Step 1: your real hourly rate

Your hourly rate has to pay three things: the business's running costs, your wage, and a profit for the business. Most people guess it by looking at what others charge. Work it out instead.

Running costs for a yearExample
Van, including finance, tax and servicing£6,000
Fuel£3,000
Insurance£1,200
Tools and replacements£1,500
Phone, software and subscriptions£600
Accountant£800
Registrations and training£400
Total running costs£13,500

Add the wage you want to pay yourself before tax, say £40,000. That is £53,500 a year to cover.

Now the part most people get wrong: billable hours. A year has 52 weeks, but take off holidays, bank holidays and a couple of weeks of illness or quiet, and you might have 46 working weeks. In a 9 hour day, travel, quoting, collecting materials and paperwork leave perhaps 6 billable hours.

46 weeks × 5 days × 6 hours = 1,380 billable hours.

£53,500 ÷ 1,380 = £38.77 an hour, just to cover costs and your wage. That is before any profit for the business. Your numbers will differ; the method is the point.

Step 2: labour on the job

Estimate the hours honestly, including the parts that are not the job itself: setting up, protecting floors, isolating and draining down, testing, clearing up. If you work with a labourer or apprentice, price their hours at their own cost rate.

Keep a note of how long jobs actually take against what you quoted. After a few months, your estimates get much better.

Step 3: materials

Price from a current merchant quote or your up to date price list, not from memory. Then:

  • Add waste. Tiles, boards, timber and pipe always need more than the measured quantity. Ten percent is a common starting allowance for tiles; adjust to the job.
  • Buy in packs. If adhesive comes in 20 kg bags, you buy whole bags. Work out the quantity with waste first, then round up to whole packs.
  • Add your markup. Ordering, collecting, storing and guaranteeing materials is work. A markup on materials pays for it.

Step 4: the costs that hide

These are the lines that turn a profitable job into a favour:

  • Access: scaffold, towers, ladders, parking permits, congestion charges.
  • Protection: dust sheets, floor protection, carpet film.
  • Disposal: skip hire, tip fees, waste carrier costs.
  • Sundries: fixings, sealant, PTFE, clips, adhesive, grout, trims.
  • Making good: filling, plastering, touching in.
  • Hire: tools and plant you do not own.
  • Subcontractors: an electrician for the extractor, a plasterer for the ceiling. Get their price in writing.
  • Notifications and certificates: Building Regulations notifications and commissioning.

Step 5: profit

Profit is not your wage. It is what the business keeps to replace the van, survive a quiet month and grow. Add it on top of costs, labour and materials. Know whether you are thinking in markup (added to cost) or margin (share of the selling price), because they are not the same number. A 25 percent markup is a 20 percent margin. Read markup vs margin.

Step 6: sense check

Before you send it, ask:

  • Would I be happy doing this job for this price if it took a day longer?
  • Is every item the customer mentioned on site in the quote, or clearly excluded?
  • Have I priced the things I will only discover when I open it up, or excluded them?

How Quote Metric helps

Quote Metric keeps your labour and material rates in a price book, works out quantities and packs with waste, shows markup and margin side by side in private, and asks about the commonly missed items for your trade before the quote can go. The AI never sets a price: every rate comes from your price book, a supplier quote you chose, or a rate you typed. See pricing.

Common questions

Should I charge by the hour or a fixed price?

For most domestic work, a fixed price for described work is clearer for the customer and rewards you for working efficiently. Use your hourly rate to build the price, then quote the total.

How much markup should I put on materials?

It varies by trade and by job size. Many trades use between 10 and 25 percent. What matters is that it covers the time and risk of buying, collecting and guaranteeing the materials.