In short
- A quote is a fixed price for described work. Both halves matter equally.
- Include: who you are, the customer and address, the scope in plain words, the price with VAT shown properly, what is not included, assumptions, how long it is valid, payment terms, the customer's right to cancel where it applies, and how to accept.
- Write the scope from what you actually saw and agreed on site, not from memory that evening.
Why the quote matters more than the job
Most disputes between a homeowner and a tradesperson are not about workmanship. They are about what was included. "I thought the tiling was part of it." "You never said the floor needed levelling." A clear quote is the cheapest insurance you will ever buy.
In the UK, Citizens Advice tells homeowners to get a written quote rather than an estimate, because a quote is a fixed price. Once accepted, you generally cannot charge more unless the customer asks for extra work or agrees to pay more. That protects them, and it protects you too, as long as the quote says clearly what the price covers. See quote vs estimate.
What to include, in order
- Your details. Trading name, address, phone, email, and your VAT number if you are registered. Company number if you are a limited company.
- Customer and works address. They are not always the same: a landlord, a son paying for his mum's bathroom, a letting agent.
- A reference and a date. So you can both point to "quote Q-0042, revision 2" later.
- A one line summary. "Replace kitchen sink and mixer tap."
- The scope, in plain words. What you will do, room by room or stage by stage. Say what you will supply.
- The price. Line by line if it helps the customer understand, with a clear total. For consumers, show the total including VAT if you are registered.
- Options. Upgrades or alternatives, each with its own price, clearly marked as optional.
- What is not included. Decorating, making good beyond a stated level, hidden defects, items the customer is supplying.
- Assumptions. Clear access, water and power available, the room emptied, choices made before the start date.
- Validity. "This quote is valid for 30 days." Materials move; you need an end date.
- Timing. Expected start and duration, and what moves them.
- Payment terms. Deposit, stages, final payment, and how they pay.
- Right to cancel. If the customer is a consumer and the contract is made at their home or at a distance, they usually have a 14 day right to cancel, and you must tell them. See the 14 day right to cancel.
- How to accept. Sign and return, reply in writing, or accept online.
A worked example
Kitchen sink and tap replacement. Remove the existing sink, tap and waste and dispose of them. Supply and fit a new single bowl stainless steel sink, mixer tap, waste and trap, with flexible connectors and isolation valves. Test for leaks. Seal to the worktop. Total £682.50 including VAT at 20 percent. Option: upgraded tap in place of the standard mixer, add £72.00 including VAT. Not included: worktop alterations; hidden pipework found in poor condition once opened up. Valid for 30 days.
Notice what that does. It names the waste, the trap, the connectors and the valves, so nobody can say later that they were extras. It states the disposal. It turns the upgrade into a choice the customer makes rather than a surprise. And it says what happens if the pipework under the sink is rotten.
Write the scope from the visit
The weakest part of most quotes is the scope, and it is weak for one reason: it is written hours after the visit, from memory and a few photos. You forget the second radiator the customer mentioned on the stairs, or that they want the tap moved to the window.
Capture the visit as it happens. Talk as you look, take photos, and say the room. Whether you use a voice memo, a notebook or an app that types it up for you, write the scope from that record rather than from memory.
Words that cause trouble
- "Supply and fit" without saying what is supplied. Name the items.
- "Make good" without saying to what standard. Filled ready for decoration is not the same as decorated.
- "Approx." on a quote. If it is approximate, it is an estimate. Call it one.
- "Day rate" with no number of days. Citizens Advice warns homeowners about exactly this.
- "Subject to survey" on a quote you have already surveyed for.
Send it while they still remember you
A quote that arrives the same day looks organised. One that arrives a week later looks like you do not want the job. If you cannot price it properly that day, send a short note saying when it will come, then keep to it.
How Quote Metric helps
Quote Metric records the visit on your iPhone, types it up and lists the work it heard with the words or photo behind each item. You price it from your own rates, the trade pack asks about the commonly missed items, and the quote is held until it has a scope, a price, terms you have checked and, for customers at home, a cancellation notice. See how it works.
Common questions
Is a verbal quote binding?
A verbal agreement can form a contract, but it is very hard to prove what was agreed. Put every quote in writing, and keep a record of what was said on site.
How long should a quote be valid for?
Long enough for the customer to decide, short enough that your material prices still hold. Thirty days is common. Match it to your merchant's quote if you used one.
Should I charge for quotes?
Most domestic trades quote for free. Some charge for complex surveys or design work and deduct the fee if they win the job. If you charge, say so before the visit.
Sources
- www.citizensadvice.org.uk/consumer/getting-home-improvements-done/before-you-get-building-work-done
- www.legislation.gov.uk/ukpga/2015/15/contents
- www.legislation.gov.uk/uksi/2013/3134/contents
Checked and updated 21 November 2026. Found something out of date? Email chris@ai-metric.com.